Stalin’s Soviet Union · TURNING POINT ·
Dnieper Hydroelectric Station (1932)
On the Stalin’s Soviet Union map as “Dneprostroi”
Oct 1932 — The Dnieper hydroelectric station opens at Zaporizhzhia, then the most powerful in Europe, built with American engineers under Hugh Cooper. In August 1941 retreating Soviet forces blew a breach in the dam to deny it to the Germans.
- When
- Type
- Turning point
- Chapter
- Stalin’s Five-Year Plans (chapter 4 of Stalin’s Soviet Union)
- Atlas
- The Soviet Union under Stalin, 1924–1953
Chapter 4 is part of membership. WW2 is free — every chapter. Try chapters 1–2 of any 2 other atlases (3 with a free account). Opening a new atlas uses one of them. Membership opens all 21 — Join.
Free printable Stalin’s Soviet Union study guide, sent by email ↓

In the same chapter
Related
THE FREE PRINTABLE STUDY GUIDE
Join the Dispatch — a short welcome series, then a letter when a new atlas opens — and the printable study guide for The Soviet Union under Stalin is yours now, free.
NO TRACKING · YOUR ADDRESS IS USED FOR THE DISPATCH AND NOTHING ELSE · UNSUBSCRIBE ANYTIME